Amazon LBA2 installation
Back to News
Case StudyHowcroft Signs June 2026 Wath upon Dearne

Howcroft Signs Transforms Amazon LBA2 Fulfilment Centre with High-Impact Industrial Branding

A comprehensive visual transformation project at Amazon's LBA2 Fulfilment Centre — showcasing our capability to supply, manufacture, and fully install large-scale industrial signage within active 24/7 logistics environments.

Site preparation underway — pre-installation with safety cones and branding panels ready for deployment
Completed Pick & Stow Briefing Zone — fully wrapped floor-to-ceiling with integrated Scanner Station
Large-scale perimeter wall wrap with LBA2 Fulfilment Centre branding behind yellow safety barriers
Installation in progress — graphic panels being staged across the live fulfilment floor
Perimeter wall wrap — vibrant multi-coloured geometric scheme with LBA2 logo, anti-scuff architectural finish
Integrated Gemba Board — custom interactive visual management tool for KPI tracking and continuous improvement

The extensive rollout introduces a vibrant, multi-coloured geometric branding scheme that brings energy and structural clarity to the warehouse floor. Moving far beyond traditional directional signage, the project introduces highly functional operational hubs designed to streamline communication, optimise daily workflows, and elevate team morale.

Turning Open Spaces Into Productive Hubs

As featured on our new Industrial Solutions Showcase , the installation encompasses several custom-built elements engineered entirely in-house:

Pick & Stow Briefing Zones

Dedicated team areas bordered by floor-to-ceiling wraps, designed for clear shift stand-ups and safety huddles.

Integrated Gemba Boards

Hard-working, interactive visual management tools that keep KPIs and continuous improvement metrics front and center.

Custom Scanner Stations

Functional areas tailored around heavy facility use to enhance workplace organisation.

Large-Scale Perimeter Wall Wraps

High-definition, UV-stable vinyl graphic panels that flawlessly align behind protective yellow safety barriers.

Minimal Disruption, Maximum Safety

Executing a build of this scale inside a live fulfilment centre requires meticulous planning. Howcroft Signs handled the entire lifecycle — from initial engineering design and precision manufacturing to the final physical installation. Working seamlessly around ongoing logistics operations, the installation team ensured zero downtime for the facility, delivering a premium, anti-scuff architectural finish on budget and with minimal disruption.

Watch the Transformation in Action

Want to see how we take a project from site preparation to a fully completed build? Watch our behind-the-scenes installation video to see the Howcroft team in action at Amazon LBA2.

Watch the Installation Video on YouTube

Behind-the-scenes: Amazon LBA2 Fulfilment Centre

Project Snapshot

ClientAmazon LBA2
LocationWath upon Dearne
CompletedJune 2026
ScopeFull Design, Manufacture & Install
EnvironmentLive 24/7 Fulfilment Centre
DowntimeZero
FinishAnti-Scuff Architectural

Ready to elevate your facility?

Explore our bespoke workspace transformations or book a custom site survey.

View Industrial Solutions 01709 878282 hello@howcroft.group

Howcroft Signs is a sister company of Howcroft Group, specialising in bespoke industrial signage, branding, and visual workplace solutions. Together we deliver complete MRO, safety, and branding capability under one group.